
FSE® In the News
CB&I Completes Shell Ethylene Project in Singapore
Fiberglass Structural Engineering has been proud to support Shell Chemicals and
CB&I Lummus TEC Joint Venture with FRP Specialist Quality Assurance Inspection for
fiberglass pipe fabrication and construction site installation and joining. FSE® congratulates Shell and CB&I Lummus TEC JV on a successful project.
from Business Wire
ExxonMobil Announces First LNG Cargo at Adriatic Terminal
"Fiberglass Structural Engineering is proud to have supported ExxonMobil with FRP Specialist engineering and third party quality assurance inspection for the fiberglass piping systems on its offshore ALNG Terminal Project. FSE® congratulates Qatar Terminal Limited and ExxonMobil on a successful project."
from Business Wire
Family Businesses Share How Working Together Works
from Northwest Business Monthly
FSE appoints Chris Renoud as new CEO.
from Bellingham Business Journal
Bellingham engineering firm reports revenue growth, hiring
PDF file 103 KB, from The Bellingham Herald, April 13, 2009
FSE® Case Histories
• Case History Illustration Chimney Liners - PDF file 268 KB
• Case History Illustration Large Diameter Pipe - PDF file 1.1 MB
• Case History Illustration Pipe FEA - PDF file 1.1 MB
• Case History Illustration Kennecott Stack - PDF file 372 KB
FSE® Publications
• Presentation - Design of Above Ground FRP Piping Systems, TAPPI, 1987 - PDF file 4.2 MB
• Steps to Successful FRP Applications, 1987 NACE - PDF file 1.6 MB
• Summary for the Guidelines of Using FRP in Utility FGD Systems, 1991 SO2 Control Symposium - PDF file 5.8 MB
• FRP Engineering - The Ultimate Assurance of Value, 1979 - PDF file 4.2 MB
• In Search of the Optimum Pipewater Material for Seawater Services, 2004 NACE - PDF file 6.5 MB
• Fiberglass Reinforced Plastics and Their Successful Use in Flue Gas Desulfurization Equipment, 1982 - PDF file 11.3 MB
• Design for Reliability in Large Fiber Reinforced Plastic Structures, 1978 - PDF file 3.8 MB
• Design of Above Ground FRP Piping Systems, TAPPI 1987 - PDF file 5.6 MB
• Effective Engineering Approaches for Successful FRP Corrosion Applications - PDF file 4.9 MB
• End User Quality Assurance, The Key to FRP Reliability, 2001 - PDF file 2.8 MB
• FRP Liner Shoulder Analysis 1983 - PDF file 354 KB